JavaScript must be enabled in order for you to see the posts in this forum. However, it seems JavaScript is either disabled or not supported by your browser. To see the posts, images and links please enable JavaScript by changing your browser options, then try again.


Thread Rating:
  • 0 Vote(s) - 0 Average
  • 1
  • 2
  • 3
  • 4
  • 5
News Gsat 15 to launched on November 10
Saturday 31-October-2015, 14:04,
Gsat 15 to launched on November 10
Preparations for Arianespace’s sixth heavy-lift mission of 2015 have advanced into the payload integration phase, with the Indian GSAT-15 satellite passenger making its first contact with launcher hardware.

The milestone for Arianespace Flight VA227 occurred this week at the Spaceport in French Guiana with GSAT-15’s installation atop the cone-shaped adapter that will serve as its interface with Ariane 5.  This was followed by the transfer of GSAT-15 from the Spaceport’s S5 payload preparation facility to the launcher Final Assembly Building, where it will be readied for installation atop its Ariane 5.

Flight VA227 is set for a November 10 liftoff from the ELA-3 launch zone.

Add Thank You Reply
[-] The following 2 users say Thank You to amatan for this post:
MJ786, Mr.Kumarbhai


Possibly Related Threads...
ThreadAuthorRepliesViewsLast Post
  Update: ARABSAT-6B (BADR-7) /GSAT-15 will be launched on 11 November 2015 amatan 0 284 Saturday 07-November-2015, 10:34
Last Post: amatan



Users browsing this thread: 1 Guest(s)

DMCA.com Protection Status